Bostik
INDUSTRIAL FACILITY
This project was done in two phases over a two-year period while the building was fully occupied. The scope of work included renovations to existing office space and labs, and the addition of office spaces and specialty labs within the existing building envelope.
ARCHITECT
Uihlein/Wilson – Ramlow/Stein Architects
PROJECT TYPE
Renovation and Addition
OWNER
Bostik